The early projects between 1990 and 1997
Whu Zhi Zou Island,
P.R. of China
The drilling rig project in Kvaerner Warnow Werft 1998-2001

Searching for new orders in end of 1997, I was ask to join Kvaerner Warnow Werft's planning team.
I entered the ship yard and worked as employee until April 2002. The main tasks I followed up are listed below.

Compiling building methodologies for sections of a container vessel CV2500, spring 1998,
Responsible project engineer for an investment into a panel production line, 1998/1999

Responsible planning engineer for building methodologies for the drilling rig project "Stena Don".
This was including the full participation on the project preparations and on technology decisions
1998 – 2001
• Compiling the over all building methodology
• Preparations of onshore investments for structural supports
• Organisation of technology purchasing
• Leading engineer for compilation of shop technologies (up to 10 employed engineers)
• Hiring a heavy lift barge for float out (two years in advance)
• Preparation of 2 Jack-Up operations (1500 t and 1600 t)
• Compiling of a float out technology of a non stabile separate starboard pontoon
• Compiling of a float out technology of the drilling rig
• Preparation of the towing of the rig to Stavanger
• Preparation of the disconnection and separation of rig and barge
The projects since 2002