Marine Consultant
Grad. Engineer for
Shipbuilding Technology
Int. Welding Engineer
Marine Projects Management
Building Supervision
Ship Stability Calculations
Marine Surveying
(C) Andreas Hallier 2011
The projects since 2002, (only parts of it)
• 3D modelling of 12 pontoons and stability calculations 2002
• 3D modelling of 6 tunnel elements 22.000 to 24.000 t each, for river “Warnow” street tunnel and stability calculations of the submerging operation 2002
• Project manager for the reconstruction of the “Traditionsschiff”, IGA Rostock, 2002/2003
• Concept, design, and stability calculations for pontoon “Felix”, 2002/2003
• Submerging operation of “FP36” pontoon for slipway for Volvo Ocean Race 2004
• Preparation of a salvage operation of capsized pontoon “Aarsleff 101” with 900 t floating crane 2004
• Several surveys on board of river cruise and sea going cruise vessels in 2004 and 2005
• Preparation of a salvage operation of capsized pontoon “GP54” on River Danube 2004
• Concept design and project management of the 4* day cruiser vessel project (500 pax) 2004/2005
• Preparation, compilation of technologies and supervision of heavy weight load out / load off operations: 1 open cast mining dredger 240 t, quay to pontoon to quay, 2004, 3 transformers 380 t, quay to pontoon to quay, 2003/2004, 1 bridge construction (new bridge to island of Ruegen) 1050 t, quay to pontoon, 2005
• Hydropolis / Crescent Hydropolis Projects, various under water hotel technologies and concept designs, studies, feasibility studies, on site investigations in near and far East, since October 2002
• Building supervisions and ship new building inspections, of AIDA new building vessels “AIDAdiva”, “AIDAbella”, “AIDAluna”, “AIDAblu”, "AIDAsol", AIDAmar" in Neptun Werft, Rostock, Meyer Werft, Papenburg and in other locations at sea, in Germany, Poland and China, since 2006, still ongoing
• Barge inspections in preparations of an offshore use, in Taixin, China 2008
• Ship conversion concept for a research vessel 2007/2008 (for the University of town of Rostock)
• A vessel assessment for wind turbine installation vessels 2008
• Project manager for load out of three 758 t, 102 m pipes onto a barge, 2009
• Marine consultant for transport matters related to Offshore wind park transition pieces, 2010
• Ballast engineering for a skid out operation Transformer 1000 mt onto an barge, 2010
• Marine consultant for submerging operations, 2010/2011